Document Type : Research Paper
Authors
1 School of Mechanical Engineering, Shiraz University, P.O.Box: 7193616548, Shiraz – Iran
2 Nuclear Safety and Reactor Research School, Nuclear Science and Technology Research Institute, AEOI, P.O.Box: 11364-3486, Tehran - Iran
Highlights
1. NUREG/CR-1150. Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants. Washington Dc.: U.S. Nuclear Regulatory Commission (1990).
2. NUREG/CR-4550. Analysis of Core Damage Frequency From Internal Events: Methodlogy Guidelines. U.S. Nuclear Regulatory Commission (1987).
3. P.L. BNPP, Level 1 PSA on the Project of Reconstruction and Completion of Unit 1 NPP “Bushehr", Revision 3. Atomic Energy Organization of Iran (2003).
4. 10CFR52. Early Site Permits; Standard Design Certification; and Combined Licenses for Nuclear Power Plants. Nuclear Regulatory Commission (NRC) (2017).
5. A. Volkanovski, et al, Analysis of Loss of Offsite Power Reported in Nuclear Power Plants. 234-248 (2016).
6. S. Kamyab, et al, Analysis of Possible Exemption for Passive-Designed-Profited NPPs from GDC 17 of 10CFR50 Case Study: AP1000 versus APWR and EPR, International Reliability and Safety Engineering Conference. Shiraz (2018).
7. S. Eide, C. Gentillon, T. Wierman, NUREG/CR-6890, Vol. 1: Reevaluation of Station Blackout Risk at Nuclear Power Plants: Analysis of Loss of Offsite Power Events: 1986-2004. U.S. Nuclear Regulatory Commission (2005).
8. NUREG/CR-6928. Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants. Idaho National Laboratory (2007).
9. A. Annex, Advance Light Water Reactor Utility Requirement Document : Vol II: ALWR Evolutionary Plant. Electrical Power Research Institute (3/1999).
10. R. Billinton, R. Allan, Basic Power System Reliability Concepts, 365-384 (1990).
11. M. Cepin, Advantages and difficulties with the application of methods of probabilistic safety assessment to the power systems reliability, 136-140 (2012).
12. S. Kamyab, et al, Development of a Hybrid Method to Assess the Grid-related LOOP Scenarios for an NPP, Reliability Engineering System Safety (Under Review) (2020).
13. A. Volkanovski, M. Cˇepin, B. Mavko, Application of the fault tree analysis for assessment of power system reliability, 94 , 1116–1127 (20009).
14. P. Henneaux, P.-E. Labeau, J.C. Maun, A Level-1 Probabilistic Risk Assessment to Blackout Hazard in Transmission Power Systems, 41-52 (2012).
15. L. Haarlaa, et al, A method for analysing the reliability of a transmission grid, 277-287 (2008).
16. D. Marks, Loss of Offsite Power — Three Unit Trip (LER 2004-006-01). LER (2004).
17. PowerFactory2014, DIgSILENT PowerFactory, Version 15. Germany: Siemense (2014).
18. RiskSpectrum2016, RiskSpectrum PSA© Software Manual, Version 1.1.2.0. ScandPower (2016).
19. NG-T-3.8. Nuclear Energy Series, NG-T-3.8: Electric Grid Reliability and Interface with Nuclear Power Plants. Vienna: Internation Atomic Energy Agency. IAEA (2012).
20. Iran Electricity Transmission Network Relay and Protection System Regulations, Second Edition, Iran Electricity Network Management Company (1396) IGMC.
Keywords