Document Type : Scientific Note
Authors
Highlights
[1] V. khorrami, Using PSA method in reliability asseessment of emergency power supply of bushehr nuclear power plant and analyse of staion blackout accident, M.S. thesis, Sharif University, (1389).
[2] S. kordalivand, Analyse of inadvertent opening using PSA method and SAPHIRE code, M.S. thesis, Sharif University, (1393).
[3] Atomenergoproekt, Final Safety Analysis Report, Chapter 6, FSAR, Moscow, Editor. (2008).
[4] Atomenergoproekt, BNPP Probabilistic Safety Assessment, level 1, revision 3, state research, Design and Engineering Survey Institute, (2003).
[5] K.J. Kvarfordt, S.T. Wood, C.L. Smith, Systems Analysis Programs for Hands-On Integrated Reliability Evaluations (SAPHIRE) Code Reference Manual, INL/EXT-05-00644 Rev. 1, August (2008).
Keywords