Optimization Spacing between Explosion Holes in Advancing Shafts of Uranium Mine in Saghand

Document Type : Research Paper

Authors

Abstract
Uranium mine in Saghand area can be mined and exploited using different underground methods. In order to achieve this goal, two vertical shafts each 350m in length were sunk and equipped. In this article two methods which have been applied by Russian and china experts will be explained and then they will be compared with each other. Based on the advantages and disadvantages of the applied methods, a third method has been derived from their comparisons. This last method was found to have many advantages and was accepted as an selected method for the Saghand Uranium explotation.

Highlights

 

 

1. ر. استوار، ”آتشکاری در معادن،“ انتشارت، (1373).

 

2. ا. افروز، ”آتشباری در معادن،“ انتشارات، (1369).

  

3. Atlas power company explosive and rock blasting, ABA Publishing Company (1987).

 

4.  C. Jeimo Lopez, E. Jemeno Lopez, F. Javier Ayala Carcedo, "Drilling and blasting of rocks," Balkema (1994).

   

5. Product Catalogue, Parchin Chemical Factories (1998).

 

 

 

 

 

 
   

 

 

Keywords


 
 
1. ر. استوار، ”آتشکاری در معادن،“ انتشارت، (1373).
 
2. ا. افروز، ”آتشباری در معادن،“ انتشارات، (1369).
  
3. Atlas power company explosive and rock blasting, ABA Publishing Company (1987).
 
4.  C. Jeimo Lopez, E. Jemeno Lopez, F. Javier Ayala Carcedo, "Drilling and blasting of rocks," Balkema (1994).
   
5. Product Catalogue, Parchin Chemical Factories (1998).